US 113 Phase 3 Preliminary Study – Preliminary Drainage, Stormwater Management, and Erosion & Sediment Control, Maryland State Highway Administration, Worcester County, Maryland:
NMP was responsible for the development of the preliminary drainage, stormwater management, and erosion & sediment control designs along US 113 north of Massey Branch to Five Mile Branch Road. This project consisted of adding an additional lane to each direction of existing US 113 as well as an open space median. The preliminary designs completed by NMP will be used by the Maryland State Highway Administration to advertise the project as a Design-Build package.